Federal panel reviews park fencing plan and White House visitor screening center
-
Click here to listen to this article - Share via
- A federal arts panel is weighing a Trump administration plan to ring Lafayette Park with new fencing, curbing access to a historic protest site.
- The proposal would add controlled gates and potentially enclose four corner monuments.
- Commissioners are also reviewing a 33,000-square-foot underground visitor screening center beneath nearby Sherman Park, designed to replace tents and streamline ID checks.
WASHINGTON — The Trump administration is proposing to improve security near the White House by putting a fence around Lafayette Park to help limit public access when law enforcement authorities determine doing so is necessary.
The proposal is scheduled for consideration on Thursday by the U.S. Commission of Fine Arts, according to a meeting agenda and the plans posted on the agency’s website. The agency has oversight over the design of construction on federal land in Washington.
The commissioners are also set to take another look at the design for an underground facility to screen the thousands of tourists and others who visit or work at the White House. All seven commissioners were appointed by the Republican president.
The proposals are being considered at a time when security for the president has become a top concern. President Trump has been the target of multiple assassination attempts, including two during the 2024 campaign and a third in April as he attended a dinner in Washington with White House journalists.
Those concerns were heightened the following month when U.S. Secret Service officers fatally shot a man who opened fire near a White House security checkpoint.
The administration says the projects will be an improvement over temporary structures that have long been used to aid perimeter security, like barriers fashioned out of bicycle racks, and for screening the many guests who access the White House and its grounds.
A look at both projects:
Lafayette Park last had a permanent fence in the late 1800s
Trump was accompanied by Interior Secretary Doug Burgum on a recent tour of the park to see updates being made at his direction. The president has worked with the Interior Department and one of its agencies, the National Park Service, to restart dormant park fountains.
“We’re really doing a job at Lafayette Park, which is really the entrance to the White House, and that’s going to be completed very shortly and it’ll be incredible,” Trump said in June.
The administration’s 79-page proposal for the 8-acre park calls for fencing it all the way around with gates at the north and south entrances to control public access. Options call for either including or excluding four monuments at each of the park’s four corners.
The proposal, which is backed by the Secret Service and the Executive Office of the President, in coordination with the Interior Department and National Park Service, notes that leaving out the monuments would expose them to vandalism.
The report says the goal of the plan is to “enhance long-term safety,” preserve the Lafayette Park’s identity as a significant National Park Service landscape and “maintain public access to this nationally symbolic space.” Throngs flock to the park to protest or celebrate major events.
Lafayette Park has not had a permanent fence around it since the 19th century. The Secret Service anticipates the fence would start going up sometime next year.
The administration wants similar fencing along Pennsylvania Avenue on the north side of the White House complex, from the Treasury Department building at 15th Street to the Eisenhower Executive Office Building at 17th Street. The report said that will be treated as a separate proposal and submitted to the commission at a later date.
White House visitor screening facility could replace currently used tents
The commission is set to review a revised design for the facility, which would be built beneath Sherman Park, federal land southeast of the White House, to support screening for public tour participants, guests attending large events, White House staff and contractors.
The original design called for locating the facility’s entrance at the southern end of the park, but meetings and consultations led to a revised proposal that shifted the entrance to the western edge to avoid conflicts with infrastructure and minimize the impact on the surrounding views, according to the report submitted for the commission’s review on Thursday.
The administration said the permanent facility will eliminate the need for a series of temporary screening tents used for events, improve security at the White House complex and enhance the experience for visitors.
The Secret Service, Interior Department, National Park Service and Executive Office of the President want to start construction in August on the 33,000-square-foot underground facility. They have set a July 2028 date for it to be operating.
White House visitors would face an initial ID check before they enter the facility through a pavilion above ground, then head down to a lower level and a second checkpoint. After they are cleared, visitors will ride escalators that will take them up to the White House grounds.
Superville writes for the Associated Press.