SPECIAL TO THE TIMES: Marilyn Bates is an aspiring playwright who lives in Fullerton

The latest time some teen-agers set the nearby ravine on fire, we decided it was time to replace our 20-year-old shake roof.

But with what? New wood, pressure-treated with fire retardant? Fiberglass/asphalt shingles? Metal? A cement or clay product? The answer didn’t come easily.

Simply knowing we wanted a roof that wouldn’t burn wasn’t enough to evaluate a salesman’s pitch. So we started a three-column chart: cost per 100 square feet, advantages and disadvantages.

Advertisement

After talking with some neighbors, we began our search for information and brochures at local retail and building supply stores. Since the fire ratings of some materials are affected by which under-roof is selected, we learned there’s more to re-roofing than the layer that shows. We needed to know how many pounds our house framing would support, what weight felt or cap sheet (with or without mineral coating), and if we wanted a slat, plywood, chipboard or greenboard base.

Many homeowners we spoke to simply trusted their contractor to “do the right thing.” This concerned us since we were learning little things such as how the number of nails or staples that are driven into an asphalt shingle affects how much wind it can withstand. Most roofers we watched used three, negating the higher wind warranty requiring six.

So our next stop was the library. Consumer’s Guide and comparable publications gave us good basic information. Books on roofing familiarized us with flashings, valleys and techniques of installation. Our chart expanded.

Between the “Home and Garden Show” and roofing supply companies we learned the most. We saw three- to four-foot-square sample sections of many materials and had our questions answered--often with conflicting replies, reinforcing our need to research which was right. Contractors showed us photographs and gave us addresses so we could see various colors in natural light. This was a great help since we both had difficulty visualizing the finished job.

After reading every word in the brochures (noting such statements as “not suitable in freezing temperatures” and “not recommended where winds exceed 40 m.p.h.”), we found ourselves studying the disadvantage column of our chart more than any other.

We checked our city’s fire code requirement, discovering that each city and county has its own. Since we have a second story to paint, roof “walkability” was important. Maintenance of solar panels, air conditioners or skylights must also be considered. To prevent bending or breaking, we learned, many cement, metal and slate products can be stepped on only at certain points.

Advertisement

One fact we found out later was that TV antenna guy wires can be attached only through wooden or asphalt materials. This situation is easily overcome if you have a standard chimney, a sturdy post anchored to the under-eaves or if you put the antenna in the attic--except for metal roofs, which interfere with attic reception.

Because of the time and labor involved, the steepness of our roof and the cost of dumping we decided against stripping off the old shakes ourselves to cut our cost. Overlaying an old roof with steel, we discovered, can decrease the price about a third. Although two roofs offer better insulation, according to our fire department, the double roof may delay both the detection and ventilation of a fire inside your home. We also found that some warranties are invalid if one material is put over another (especially asphalt products). And remember, the total weight of all materials must not exceed the limit of your roof’s bracing.

Because contractors must walk the roof to make a bid and shakes split easily, we waited until we narrowed our material selection to three before making any appointments.

Using their license numbers and the information on their business cards, we checked out whether each contractor had any complaints or litigation pending against them. The latter information is obtained by calling the Complaints Disclosure Department of the Consumer Complaints and Protection Coordinators. The southern CCPC region, at (714) 994-7450, extends from Buena Park to the border. The central region, at (818) 543-4735, covers from Buena Park to Northern California.

We then called the State Contractor’s Licensing Board (800) 321-2752, verifying that their licenses would still be in force while they were doing our job. The roofer’s workman’s compensation insurance can be verified by calling the Home Improvement Department under the CCPC heading in the white pages of the telephone directory; liability insurance can be checked by calling the contractor’s insurer directly.

The CCPC also recommends obtaining a booklet titled “What You Should Know Before You Hire a Contractor” from your local CCPC district office. Gutters were an item we did not carefully consider. Our contractor casually mentioned them and we declined. Afterward, we discovered why they were needed. Unlike wooden shakes, which soak up night moisture, other materials drip water, sometimes copiously. We later installed lightweight plastic gutters in key areas and now irrigate some bushes with the runoff.

Advertisement

From our research we learned there are other factors that increase re-roofing costs: roof slopes exceeding a rise of 6 inches in 12, upgrading the under-roof, damaged support beams or dry rot (our contractors would replace up to 100 linear feet without additional charge). If the material selected is heavier than your house can support, the reinforcement necessary must be done by a structural engineering contractor, not a roofing contractor.

Because of our experience, we’d advise giving careful consideration to factors such as house paint color, when you intend moving, and after-installation care.

Before signing a contract, read every word. If special work is being done, insist on a descriptive diagram. Request both a starting and finishing date and be present during installation. Don’t forget after-installation touch up and vent painting, and getting the signed unconditional waiver and release when making the final payment. Above all, leave plenty of time for the unexpected.

In the end, we felt the time spent researching gave us the understanding we needed to be confident with our decision. And, we were lucky, it didn’t rain!