Advertisement

FREEWAY REPAIRS : Caltrans Issues Advisory About Scheduled Freeway Work Areas

Share

Caltrans advises motorists that it has scheduled the following freeway work in the Southeast and Long Beach area this week. Repair locations are spotted on the map by number and are identified in the list below by the nearest city or cities.

ARTESIA FREEWAY (91)

1. Bellflower: Eastbound No. 6 lane; Woodruff Avenue to southbound San Gabriel River Freeway (605) separation and connector roads; today, 6:30 a.m. to 12:30 p.m.; raised markers.

2. Cerritos: Westbound No. 3, 4 and 5 lanes; Pioneer Boulevard to northbound San Gabriel River Freeway (605) junction, westbound Artesia Freeway (91) connector to northbound and southbound San Gabriel River Freeway (605), Pioneer Boulevard on-ramp, Studebaker Road off-ramp; today, 6:30 a.m. to 12:30 p.m.; raised markers.

Advertisement

3. Long Beach: Westbound No. 2, 3 and 4 lanes; east of Atlantic Avenue to Long Beach Freeway (710), Atlantic Avenue on-ramp, northbound Long Beach Freeway (710) connector to westbound Artesia Freeway (91), No. 1 lane of southbound Long Beach Freeway (710) connector to westbound Artesia Freeway (91); today, 6 a.m. to 1 p.m.; patching.

HARBOR FREEWAY (110)

4. Carson: Southbound on-ramp from eastbound Sepulveda Boulevard; Monday and Tuesday, 9 a.m. to 2 p.m.; landscaping.

5. Carson: Southbound alternating lanes; at Carson Street and 223rd Street off-ramps; Monday, 9 a.m. to 3 p.m.; stenciling.

6. Carson: Northbound No. 4 lane; at 228th Street; Wednesday and Thursday, 9:30 a.m. to 1 p.m.; bridge repair.

7. San Pedro: Eastbound Terminal Island separation ramp; northbound Harbor Boulevard on-ramp; Wednesday and Thursday, 9 a.m. to 2 p.m.; landscaping.

LONG BEACH FREEWAY (710)

8. East Los Angeles: Northbound and southbound alternating lanes; Olympic Boulevard off-ramp and on-ramp; Wednesday, noon to 2 p.m.; stenciling.

Advertisement

POMONA FREEWAY (60)

9. South El Monte: Eastbound No. 1 lane; San Gabriel Boulevard to Santa Anita Avenue; Tuesday and Wednesday, 9 a.m to 2 p.m.; crack seal repair.

10. South El Monte: Eastbound No. 1 lane; San Gabriel River to Workman Mill Road; Thursday, 9 a.m. to 2 p.m.; crack seal repair.

11. South El Monte: Westbound No. 1 lane; San Gabriel River Freeway (605) junction to Santa Anita Avenue; Friday, 9 a.m. to 2 p.m.; crack seal repair.

SAN GABRIEL RIVER FREEWAY (605)

12. Cerritos: Southbound No. 4, 5 and 6 lanes; Alondra Boulevard to South Street, southbound San Gabriel River Freeway connector to eastbound and westbound Artesia Freeway (91), Alondra Boulevard on-ramp, South Street off-ramp; today, 6:30 a.m. to 12:30 p.m.; raised markers.

13. Long Beach: Northbound No. 4 lane; at Wardlow Road; Tuesday, 9:30 a.m. to 1 p.m.; bridge repair.

14. Santa Fe Springs: Northbound No. 4 lane; Telegraph Road to Slauson Avenue, Telegraph Road on-ramp, Slauson Avenue off-ramp; Monday, 9:30 a.m. to 2:30 p.m.; raised markers.

Advertisement

15. Santa Fe Springs: Southbound No. 4 lane; Washington Boulevard to Telegraph Road, Washington Boulevard on-ramp and Telegraph Road off-ramp; Tuesday, 9:30 a.m. to 2:30 p.m; raised markers.

16. Santa Fe Springs: Southbound No. 1 lane; Telegraph Road to Firestone Boulevard; Wednesday, 9:30 a.m. to 2:30 p.m.; raised markers.

SANTA ANA FREEWAY (5)

17. Commerce: Southbound No. 4 lane; at Slauson Avenue and Slauson Avenue off-ramp and on-ramp; today, 6 to 11 a.m.; bridge repair.

18. La Mirada: Northbound No. 4 lane; Artesia Boulevard to Rosecrans Avenue; Thursday, 8:30 a.m. to 3:30 p.m.; landscaping.

19. Norwalk: Southbound alternating lanes; Norwalk Boulevard off-ramp and on-ramp; Friday, noon to 3 p.m.; stenciling.

20. Santa Fe Springs: Southbound No. 4 lane; Florence Avenue overcrossing to Orr & Day Road on-ramp, westbound Florence Avenue on-ramp; Tuesday, Wednesday and Thursday, 8 a.m. to 2 p.m.; landscaping.

Advertisement

21. Various Cities: Northbound and southbound No. 1 lanes; Artesia Boulevard to Indiana Street; Tuesday and Wednesday, 8 a.m. to 2 p.m.; sweeping.

Advertisement