Advertisement

Electrifying Rail Lines

Share

The Southern California Regional Rail Authority Task Force has stated that the electrification of the 806 miles of Southern California commuter and freight rail service will cost $4.6 billion and take 18 years to complete.

This works out to a cost of $5 million per mile and a construction speed of 4 miles per month.

I should like to point out the following: In 1978 South Africa electrified 542 miles of track, a rate of 45 miles per month. In 1977 Russia electrified 497 miles of track. There are numerous other examples. With regard to cost, in 1977 the French instituted a 10-year program to electrify 780 miles of track at a cost of (U.S.) $800 million, about one-fifth of the rail authority estimate. Similarly, Italy, between 1975 and 1979, spent only $75 million to electrify 365 miles of track, a rate of about $2 million per mile.

Advertisement

Naturally, these figures have to be adjusted for inflation but, come on guys, I don’t get it.

LAUREN ZUCKERMAN

Sherman Oaks

Advertisement